Single Room / ADU
$540–$860
Bathroom remodels, kitchen rebuilds, ADU additions in Downtown HB and Bolsa Chica
Huntington Beach local service · Rated 4.9
Post-construction cleaning for Huntington Beach remodels and new builds — drywall dust, adhesive haze, and contractor debris removed so the project finally feels finished.
Call or text (949) 536-9790 · We reply as soon as possible during business hours
Post-Construction Cleaning · Huntington Beach
An oceanfront remodel or a Downtown HB ADU addition is impressive on the day the contractors leave — but it isn’t actually livable yet. Drywall dust hangs in vents, adhesive film coats new windows, factory wrap residues cling to fixtures, and grout haze sits on every freshly tiled surface. Our post-construction cleaning is built to meet contractors and homeowners exactly where the project stops, and to deliver the home in genuinely move-in condition.
We work with HB contractors on Pacific City rebuilds, Bolsa Chica ADU additions, Seacliff full remodels, and Huntington Harbour dock-side teardowns. Our crew arrives with HEPA vacuums, ladder access for two-story interiors, and chemistry calibrated for paint overspray, joint compound, and silicone caulk residue. Every horizontal and vertical surface is detailed — including spaces drywall finishers and painters never touched.
Most post-construction projects in HB run as a two- or three-pass program: rough clean after framing and drywall, intermediate clean before flooring and finish, and final clean before homeowner walkthrough. We coordinate directly with the GC on schedule, dumpster access, and protection of finished surfaces.
Post-Construction Cleaning Scope
Review the service details below.
Transparent pricing
See the published ranges and the factors that shape your upfront price.
Single Room / ADU
$540–$860
Bathroom remodels, kitchen rebuilds, ADU additions in Downtown HB and Bolsa Chica
Whole-Home Remodel
$1,100–$2,200
Full HB remodels in Pacific Sands, Goldenwest, Edwards Hill
New Construction Estate
From $2,200
Oceanfront and harbour-front rebuilds in Seacliff, Huntington Harbour, SeaCove
Local expertise
What local homes and access conditions can mean for post-construction cleaning.
ADU additions and lot-line teardowns generate fine dust that infiltrates every shared wall — our HEPA process removes it from existing finished spaces.
New oceanfront condos and townhomes that need factory film, adhesive residue, and drywall dust fully removed before owners take occupancy.
Dock-side teardowns and waterfront rebuilds that face strict HOA timelines for completion — our coordinated multi-pass program keeps schedules on track.
Full estate remodels with custom millwork, stone, and glass that demand detail-obsessed cleaning to protect new finishes.
ADU and second-story additions popular in this area — our process protects existing living spaces from project-wide dust contamination.
View-corridor rebuilds with multi-story glass and custom interior detailing that benefit from our two-story window and surface program.
How it works
01
Share your home size, timing, and priorities.
02
We confirm what’s included and your upfront price.
03
Your trained team follows the confirmed service plan.
04
The work is checked before your team locks up.
Customer reviews
Housecall Pro verified customer
“Professional and thorough. Thank you.”
G, Jason
★★★★★
“Such a great guy, professional, fast yet efficient and thorough.”
Tiffany Peper
★★★★★
“Great quality, very professional”
Awesome Places
Good to know
Post-construction cleaning in HB ranges from $540 for a single-room remodel to $2,200+ for whole-home or new-construction estates. Most full-home projects fall in the $1,100–$2,200 range. We quote per square foot and project scope.
Most projects benefit from a multi-pass program — rough clean after drywall, intermediate clean before flooring, and final clean before owner walkthrough. We coordinate directly with your GC on the schedule.
Yes — drywall dust travels through HVAC and under doors. We routinely clean adjacent finished spaces as part of HB ADU and addition projects so the entire home is project-clean, not just the new construction.
Share any building-access or vendor-document requirements when requesting a quote, and we'll confirm the details before scheduling.
Yes, that’s standard in our final-pass scope. We remove protective film, factory adhesives, label residue, and packaging from every appliance and finish surface.
A single-room remodel takes 4–8 hours. Whole-home projects run 1–3 days depending on size. New-construction estates can require a full crew over multiple days. We scope and quote upfront.
More in Huntington Beach
Other services available in Huntington Beach.
Ready when you are
Tell us about your home and get a clear, no-pressure quote.